Lagos State govt defends Lekki–Epe minibus restriction after drivers’ protest
The Lagos State Government described the protest as disruptive and contrary to agreements previously reached with transport stakeholders.
The Lagos State Government described the protest as disruptive and contrary to agreements previously reached with transport stakeholders.
The repair works on the Apongbon Bridge will commence on Thursday (today).
Launched recently, the project aims to provide cleaner, faster, and safer water transport, reduce traffic congestion, and promote sustainable mobility ...
Mr Namadi cited the overriding public interest and the matter's sensitive nature as reasons for his resignation.
Lagos residents have been assured that officers from the Lagos State Traffic Management Authority will be deployed to manage vehicular ...
Some roads will be closed to facilitate the Access Bank Lagos City Marathon on Saturday as the Lagos Government reassured ...
The Lagos official said that any unauthorised gate or barrier should be dismantled within seven days of the announcement.
He said the diversion was to enable the demolition of the old pedestrian bridge by the Lagos Metropolitan Area Transport ...
The interchange hubs are designed to be a central nexus for various modes of transportation, enhancing connectivity and reducing travel ...
From 12 a.m. to 12 noon, the bridge would be open for Mainland Inbound Island travels. Conversely, from 12 noon ...
Mr Osiyemi said that the trucks were impeding traffic flow on the Cele-Apapa/Tincan axis.
The state government says directional signs will be made available to guide movement.
An official said the claims that the government would levy people for parking in their private residences was false.
The state government our more Local Governments (LGs) and six Local Council Development Areas (LCDAs).
The development means that Okada operations have been banned in 10 out of 20 LGAs in the state.
Mr Omotoso said after seeing the results of the ban in the six local government areas, people had been calling ...
The government says an integrity assessment would be carried out on the bridge to ascertain the level of damage caused ...
Operators are required to pay about N1.9 million down payment, which covers 20 per cent equity of the cost of ...
The governor hailed the Chinese contractor for the speed of the construction.
The traffic will be diverted from July 4 to August 1.
The governor said a rail station would be intergrated with the terminal in the next 18 months
An official said the repair was necessary to complete the rehabilitation works at the opposite side of the bridge earlier ...
The Commissioner says the closure will enable contractors move the equipment used during the rehabilitation process of the bridge.
The exercise is part of the Traffic Management Plan to actualise the Light-Rail Mass Transit Red line phase 1, Oyingbo ...
The enforcement of the new regulations will now take off from August 27, 2020 instead August 20 initially announced by ...
All content is Copyrighted © 2025 The Premium Times, Nigeria
All content is Copyrighted © 2025 The Premium Times, Nigeria