We’ll complete Akute – Ijoko road soon — Gov Abiodun
The governor gave the assurance while inspecting ongoing work on the first phase of the 9.7-kilometre stretch of the road, ...
The governor gave the assurance while inspecting ongoing work on the first phase of the 9.7-kilometre stretch of the road, ...
All content is Copyrighted © 2025 The Premium Times, Nigeria
