FG announces partial closure of Independence Bridge
The bridge links Bonny Camp and Onikan in Lagos.
The bridge links Bonny Camp and Onikan in Lagos.
Driving on the highway has been a huge nightmare for motorists since the reconstruction commenced on November 17, 2018.
The section between Kara Bridge and Isheri Junction inbound Lagos was partially closed on September 2
An FG official says the ongoing construction and rehabilitation of roads in Lagos was slowed down by the rains.
The closure of the expressway was earlier postponed by the federal government due to the busy nature of the highway.
“The first type of alternative funding source is the Sukuk, which is a type of Islamic loan with almost 0 ...
Some of the reinforcement rods on top of the bridge’s centre had become exposed as the asphalt covering them had ...
The government estimates that minimum of 350,000 vehicles will move on the roads this season.
The repair works on the bridge would be staggered over a period of 27 months.
The controller said that the ministry was working on effective traffic diversion alternatives.
All content is Copyrighted © 2025 The Premium Times, Nigeria