Seplat Energy begins operation at new 67km Amukpe-Escravos Pipeline
The 67- kilometre long pipeline infrastructure obviates the need to depend on the Trans Forcados System.
The 67- kilometre long pipeline infrastructure obviates the need to depend on the Trans Forcados System.
All content is Copyrighted © 2025 The Premium Times, Nigeria
