How Abuja rail line launched by President Buhari works
Four days after commissioning, the Abuja rail line begins operations with slow ride, no attendants.
Four days after commissioning, the Abuja rail line begins operations with slow ride, no attendants.
All content is Copyrighted © 2025 The Premium Times, Nigeria