NERC to begin mass metering May 1
MAPs shall charge a maximum of N36,991.50 for single phase meters and N67,055.85 for three phase meters.
MAPs shall charge a maximum of N36,991.50 for single phase meters and N67,055.85 for three phase meters.
All content is Copyrighted © 2025 The Premium Times, Nigeria
All content is Copyrighted © 2025 The Premium Times, Nigeria