Seplat Energy begins operation at new 67km Amukpe-Escravos Pipeline
The 67- kilometre long pipeline infrastructure obviates the need to depend on the Trans Forcados System.
The 67- kilometre long pipeline infrastructure obviates the need to depend on the Trans Forcados System.
An official says no fewer than 15 managers from the NPDC have been affected in the redeployments.
All content is Copyrighted © 2024 The Premium Times, Nigeria
All content is Copyrighted © 2024 The Premium Times, Nigeria