$6 billion Hydropower Project: Ex-minister files N1billion suit against EFCC
EFCC had declared Mr Agunloye wanted in December 2023 over the stalled multi-billion-dollar Mambilla Hydropower Project.
EFCC had declared Mr Agunloye wanted in December 2023 over the stalled multi-billion-dollar Mambilla Hydropower Project.
The Mambilla hydropower project has a generation capacity of 3,050 Mega Watt (MG), when completed.
All content is Copyrighted © 2024 The Premium Times, Nigeria
All content is Copyrighted © 2024 The Premium Times, Nigeria